Project Description:

 

Installation of 180 fixed bollards, 12 hydraulic bollards, 2 plate barriers and one drop arm beam, along with associated site work. This project consisted of installing hydraulic bollards and all associated power and control wiring.

Owner contact:                    Architect:
Federal Reserve Bank            Hunter Roberts Construction Group

Federal Reserve Bank of Richmond